by Brandon Wirsz | Aug 12, 2026
New Engine to support response activities of the Cluculz Lake Volunteer Fire Department. Frontline service engines are required to be replaced after a maximum of 20 years of service in order to maintain grading through the Fire Underwriters Survey. This new engine...
by Brandon Wirsz | Aug 12, 2026
New Engine to support response activities of the Topley Volunteer Fire Department. Frontline service engines are required to be replaced after a maximum of 20 years of service in order to maintain grading through the Fire Underwriters Survey. This new engine ensures...
by Brandon Wirsz | Aug 12, 2026
RDBN’s annual contribution to the Bulkley-Nechako Regional Transit service operated by BC Transit. Routes offer service from Prince George to Burns Lake, and Burns Lake to Smithers. Other partners include the Province of BC, BC Transit, City of Prince George,...
by Brandon Wirsz | Aug 12, 2026
This project involved manhole and valve repairs at the lagoon facility at the Fort Fraser Sewer System. The work upgraded infrastructure to increase control over the lagoon flow and levels.
by Brandon Wirsz | Aug 12, 2026
This project involves the design and installation of a Variable Speed Pump and Supervisory Control and Data Acquisition (SCADA) system on the Fort Fraser Water System to accommodate access to control pumps, sensors, alarms, and chlorine dosing from both the head...